all experience

Project Engineering Intern

The Kraft Group / Gillette Stadium

Jun 2025 — Aug 2025

Foxborough, Massachusetts

Engineering Environment

Supported electrical distribution, facility modifications and multidisciplinary infrastructure coordination at Gillette Stadium.

Active sports facility, combining engineering drawings, multidisciplinary construction and operational requirements.

What I worked on

  • Assisted in modifying office layouts and electrical distribution pathways using AutoCAD.
  • Supported infrastructure planning for facility improvements and preparations for major events.
  • Assisted in evaluating power routes, equipment placement and electrical system tie-ins.
  • Considered operational reliability and installation requirements in an active facility.
  • Coordinated with internal departments, subcontractors and field crews to address installation conflicts.
  • Helped reconcile construction documentation with field conditions and engineering requirements.

Skills used