Project Engineering Intern
The Kraft Group / Gillette Stadium
Jun 2025 — Aug 2025
Foxborough, Massachusetts
Engineering Environment
Supported electrical distribution, facility modifications and multidisciplinary infrastructure coordination at Gillette Stadium.
Active sports facility, combining engineering drawings, multidisciplinary construction and operational requirements.
What I worked on
- Assisted in modifying office layouts and electrical distribution pathways using AutoCAD.
- Supported infrastructure planning for facility improvements and preparations for major events.
- Assisted in evaluating power routes, equipment placement and electrical system tie-ins.
- Considered operational reliability and installation requirements in an active facility.
- Coordinated with internal departments, subcontractors and field crews to address installation conflicts.
- Helped reconcile construction documentation with field conditions and engineering requirements.