SOCOM Ignite Innovation Program
MIT Lincoln Laboratory
Engineering research into ECU diagnostics, hardware testing and potential RF communication architectures.
- Period
- November 2025 – January 2026
- My role
- Engineering Researcher
- Status
- Research and feasibility evaluation
My Contributions
- Designed an ECU hardware testbench considering power distribution and signal integrity.
- Investigated ECU behavior in Linux-based simulation environments.
- Reverse engineered diagnostic message flows across simulated automotive subsystems.
- Examined system states and diagnostic protocols.
- Evaluated potential CAN-over-RF approaches, reliability, interference and security considerations.
- Explored the transition from simulation to physical hardware validation.
Engineering Evidence
Artifacts pendingTestbench documentation
Not yet supplied
Diagnostic message notes
Not yet supplied
Hardware-validation evidence
Not yet supplied
Project repository not supplied.
GitHub profileEngineering Problem
Understand automotive ECU interactions and assess the feasibility of carrying CAN communication over RF links without conflating simulation with hardware validation.
Constraints & Requirements
RF reliability, interference, security, power distribution and signal integrity constrain the proposed hardware and wireless approaches.
Simulation observations do not establish physical link performance.
System Architecture
Linux-based ECU simulation supported diagnostic message investigation. A proposed hardware testbench considered power distribution and signal integrity; wireless communication architectures were evaluated as research directions.
Engineering Decisions & Tradeoffs
Reliability, RF interference, security, signal integrity and electrical safety constrain a possible wireless bridge. Simulation results alone do not establish physical link performance.
Alternative approaches, selection rationale and quantified tradeoff comparisons have not yet been supplied.
Testing & Verification
Communication behavior was observed in simulation. Transition to physical hardware validation was explored; physical validation results and RF reliability measurements have not been supplied.
Results & Lessons
Research developed understanding of ECU diagnostics, system-level troubleshooting and hardware-testbench requirements. A production-ready wireless CAN bridge was not developed or claimed.